Approvals for a new single family home in California
This is the list ShovelCue builds for a new single family home in California before it knows anything else about the site. It has 41 items in 7 groups.
Required the rules say soLikely usual for this kind of projectCheck locally depends on the site or the town
Due Diligence & Studies
Boundary / ALTA Survey
RequiredA boundary survey fixes the lot lines the building is placed from.
Topographic Survey
LikelyGives the grades the house, driveway and drainage are drawn on.
Geotechnical Investigation / Report
Check locallyOnly where the soils, a slope or the building department call for borings.
Wetlands Delineation
Check locallyLikely needed for a project like this. Check for wetlands, floodplain or other environmental conditions.
Flood / Floodplain Study
Check locallyLikely needed for a project like this. Check for wetlands, floodplain or other environmental conditions.
Stormwater / Drainage Study
Check locallySome towns ask for a drainage plan for a new building.
Land Use & Entitlements
Variance Approval
Check locallyThe agency checks your application within 30 days, then must decide within 60 or 180 days of its environmental finding.
- Agency
- City or county planning commission or zoning board
- Clock
- Set by law
Historic Preservation Approval
Check locallyOnly in a historic district, where the commission reviews new buildings.
Coastal Development Permit
Check locallyOnly in the coastal zone. The city or county issues it where it has a certified coastal program.
- Agency
- California Coastal Commission or the city or county with a certified coastal program
- Source
- coastal.ca.gov
Zoning Permit
RequiredThe zoning office confirms the new building meets the setbacks, height and lot coverage.
HOA or Architectural Review Approval
Check locallyAn HOA may need to approve the house design before it is built.
Design & Permit Documents
Civil Design Package
Check locallyMany towns ask for a lot grading and utility plan for a new building.
Architectural Design Package
RequiredThe building drawings, from design through the permit set.
Structural Design Package
LikelyThe structural drawings the building permit is reviewed on.
Fire Protection Design Package
Check locallyOnly where the building code or the town requires sprinklers.
Foundation Design
LikelyThe foundation design for the new building.
Energy Code Package
RequiredThe energy code report, usually filed with the permit set.
Permit Drawing Set
RequiredThe signed and sealed drawing sets the building department reviews.
Issued-for-Construction Drawing Set
LikelyThe final drawings the trades build from, with the permit comments included.
Environmental & Site Authorizations
Soil / Erosion Control Approval
Check locallyShovelCue has no California record for this line yet, so check who handles it for this site.
Utilities & Infrastructure
Water Service Approval
Check locallyLikely needed for a project like this, since new buildings need new utility service.
Sewer Service Approval
Check locallyLikely needed for a project like this, since new buildings need new utility service.
Electric Service Approval
Check locallyShovelCue has no California record for this line yet, so check who handles it for this site.
Road Opening Permit
LikelyA new driveway or utility connection in the street needs a road opening permit.
Permits & Construction Authorizations
Demolition Permit
Check locallyUsual when an existing structure is demolished.
Building Permit
RequiredThe building permit. Many towns start the review only after the earlier approvals are in hand.
Plumbing Permit
RequiredThe plumbing permit, reviewed on the same clock as the building permit.
Electrical Permit
RequiredThe electrical permit, reviewed with the building permit.
Mechanical / HVAC Permit
RequiredThe heating and cooling permit, reviewed with the building permit.
Fire Protection Permit
Check locallyOnly where the building code or the town requires sprinklers.
Retaining Wall Permit
Check locallyOnly if the scope includes it.
Temporary Power Permit
LikelyLets the utility connect temporary power for construction.
Health Department Approval
Check locallyOnly with a well or septic system, or food service.
Certificate of Occupancy
RequiredEvery occupiable building needs it before use.
Construction Readiness
Construction Entrance Installed
LikelyA stabilized entrance so trucks do not track soil onto the road.
Erosion / Sediment Controls Installed
LikelySilt fence and controls in place before digging, as the erosion control plan shows.
Utility Mark-Out Complete
LikelyCall 811 so the state one call center marks the utility lines before digging.
Survey Control Established
LikelyThe surveyor sets control points so the building goes in the right place.
Required Site Signage / Postings Complete
LikelyThe permit placard and the labor postings on site.
Site Ready to Mobilize
LikelyThe milestone for your target construction start.
Cal/OSHA Construction Activity Permit
Check locallyNeeded before building a structure over 36 feet high or digging a trench 5 feet deep or more that workers enter.
- Agency
- Cal/OSHA
- Source
- dir.ca.gov
Sources
- leginfo.legislature.ca.govVariance Approval
- coastal.ca.govCoastal Development Permit
- dir.ca.govCal/OSHA Construction Activity Permit
Items with no source link come from the national list and are decided by the town or the site. Ask the local office.
Other project types in California
This is general information from public sources. It is not legal advice. Confirm every item with your town and the agencies named before you rely on it.