Approvals for a new multifamily building in Massachusetts
This is the list ShovelCue builds for a new multifamily building in Massachusetts before it knows anything else about the site. It has 139 items in 7 groups.
Required the rules say soLikely usual for this kind of projectCheck locally depends on the site or the town
Due Diligence & Studies
Boundary / ALTA Survey
RequiredFixes the property lines and title exceptions that lenders, boards and designers work from.
Topographic Survey
LikelyGives the grades and elevations the civil and site design are drawn on.
Existing Conditions Survey
LikelyRecords what is on the site today so the design starts from facts.
Utility Survey
LikelyFinds the utility lines on and near the site from mark outs and records.
Geotechnical Investigation / Report
RequiredSoil borings and lab tests that tell the engineers how to design the foundations.
Phase I Environmental Site Assessment
RequiredChecks the site history for contamination. Lenders usually require it before closing.
Phase II Environmental Investigation
Check locallyOnly if the Phase I warrants it.
Wetlands Delineation
Check locallyLikely needed for a project like this. Check for wetlands, floodplain or other environmental conditions.
Flood / Floodplain Study
Check locallyLikely needed for a project like this. Check for wetlands, floodplain or other environmental conditions.
Traffic Study
LikelyShows the board the traffic the project adds. Counts can depend on the season.
Parking Study
Check locallyOnly if the jurisdiction or program asks for it. Parking approach not provided.
Stormwater / Drainage Study
LikelyShows how the site handles rain under the state and town stormwater rules.
Utility Capacity Study
Check locallyOnly if the jurisdiction or program asks for it.
Environmental Impact Study
Check locallyOnly if the jurisdiction or program asks for it.
Noise Study
Check locallyOnly if the jurisdiction or program asks for it.
Other Project-Specific Study
Check locallyOnly if the jurisdiction or program asks for it.
Land Use & Entitlements
Zoning Verification / Zoning Determination
RequiredA letter from the zoning officer confirming what the zoning allows on this site.
Site Plan Review
LikelyUsual for a new building.
- Agency
- Planning board or the board the town zoning names
- State rule
- Site plan review comes from the town zoning bylaw. Its steps and deadlines are the town's own.
- Source
- mass.gov
Cape Cod Commission Regional Impact Review
Check locallyDepends on how the project is approved. Check locally.
- Agency
- Cape Cod Commission, in Barnstable County only
- State rule
- Only on Cape Cod. A project of 30 or more homes or over 10,000 commercial square feet goes to the commission.
Definitive Subdivision Plan Approval
Check locallyThe town decides whether this applies. Ask the zoning office.
- Agency
- Planning board under the Subdivision Control Law
- State rule
- The planning board acts on a definitive plan within 90 or 135 days, or the plan is approved by default.
- Clock
- Set by law
- Source
- malegislature.gov
Lot Consolidation
Check locallyUsual when a project sits on more than one lot.
Variance (Zoning Board of Appeals)
Check locallyThe board holds a hearing within 65 days and decides within 100 days of filing, or the variance is granted.
- Agency
- Zoning Board of Appeals
- Clock
- Set by law
- Source
- malegislature.gov
Special Permit
Check locallyThe authority holds a hearing within 65 days of filing and decides within 90 days after it, or the permit is granted.
- Agency
- Special Permit Granting Authority
- Clock
- Set by law
- Source
- malegislature.gov
Public Hearing
LikelyUsual for a new building.
- Agency
- The board hearing the application
- State rule
- Notice runs in a newspaper two weeks in a row, the first at least 14 days before the hearing.
- Clock
- Set by law
- Source
- malegislature.gov
Written Decision Filed with the Town Clerk
LikelyUsual for a new building.
- Agency
- The deciding board and the city or town clerk
- State rule
- The board files its written decision, with each vote and the reasons, with the town clerk within 14 days.
- Clock
- Set by law
- Source
- malegislature.gov
Zoning Appeal Period (20 Days)
LikelyUsual for a new building.
- Agency
- City or town clerk, then the Land Court, Superior Court or other court named in the statute
- State rule
- An appeal must be filed in court within 20 days after the decision is filed with the town clerk.
- Clock
- Set by law
- Source
- mass.gov
Decision Recorded at the Registry of Deeds
LikelyUsual for a new building.
- Agency
- City or town clerk and the county registry of deeds
- State rule
- A variance or special permit takes effect only when the clerk certified decision is recorded at the registry of deeds.
- Source
- malegislature.gov
Redevelopment Approval
Check locallyDepends on how the project is approved. Check locally. Redevelopment designation not confirmed.
Local Historic District Certificate
Check locallyDepends on how the project is approved. Check locally.
- Agency
- Local historic district commission
- State rule
- Only in a local historic district. The commission decides within 60 days of filing or a certificate issues.
- Clock
- Set by law
- Source
- malegislature.gov
Comprehensive Permit (Chapter 40B)
Check locallyDepends on how the project is approved. Check locally.
- Agency
- Zoning board of appeals, after a project eligibility letter from the subsidizing agency
- State rule
- Affordable housing may ask the zoning board for one comprehensive permit. The hearing opens within 30 days of a complete application.
- Clock
- Set by law
- Source
- mass.gov
Developer / Development Agreement
Check locallyDepends on how the project is approved. Check locally. Redevelopment designation not confirmed.
Off-Site / Off-Tract Improvement Agreement
Check locallyDepends on how the project is approved. Check locally.
Easement Agreement
Check locallyDepends on how the project is approved. Check locally.
Access Agreement
Check locallyDepends on how the project is approved. Check locally.
Other Land Use Approval
Check locallyDepends on how the project is approved. Check locally.
MEPA Environmental Review
Check locallyOnly when a state permit, funding or land is involved and a review threshold is met. The first review takes 30 days.
- Agency
- MEPA Office, Executive Office of Energy and Environmental Affairs
- Clock
- Set by law
- Source
- mass.gov
Massachusetts Historical Commission Review
Check locallyOnly when a state agency permits, funds or licenses the project. The commission answers within 30 days of the form.
- Agency
- Massachusetts Historical Commission
- Clock
- Set by law
- Source
- sec.state.ma.us
Approval Not Required Plan Endorsement
Check locallyOnly when lot lines change without a new road. The planning board endorses the plan within 21 days, with no hearing.
- Agency
- Planning board
- Clock
- Set by law
- Source
- malegislature.gov
MBTA Communities Multifamily Zoning Check
Check locallyFor multifamily housing near transit. In the town's MBTA Communities district it is allowed as of right, with no special permit.
- Agency
- Town zoning officer; Executive Office of Housing and Livable Communities for town compliance
- Source
- malegislature.gov
Design & Permit Documents
Civil Design Package
RequiredThe site plan drawings submitted to the board.
Architectural Design Package
RequiredThe building drawings, from schematic design through the board submission.
Structural Design Package
RequiredThe structural drawings the building permit is reviewed on.
Mechanical Design Package
RequiredThe heating, cooling and ventilation drawings for the permit.
Electrical Design Package
RequiredThe electrical drawings for the permit and the utility load request.
Plumbing Design Package
RequiredThe plumbing drawings for the permit.
Fire Protection Design Package
RequiredThe sprinkler and fire protection drawings. The sprinkler design depends on the flow test.
Fire Alarm / Life Safety Design
RequiredThe fire alarm and life safety drawings for the fire code review.
Foundation Design
RequiredThe foundation drawings, designed from the geotechnical report.
Support of Excavation Design
Check locallyUsual when the work disturbs a large part of the site.
Landscape Design
LikelyThe planting and landscape plan, often part of the site plan submission.
Lighting / Photometric Design
Check locallyOnly if the program includes it.
Energy Code Package (Base, Stretch or Specialized Code)
RequiredCheck which energy code the town adopted. Stretch and Specialized Code towns need a HERS rating or Passive House for new homes.
- Agency
- Local building official
- Source
- mass.gov
Elevator Design / Coordination
Check locallyStories not provided. Whether elevators are needed depends on the building height.
Low Voltage / Technology Design
Check locallyOnly if the program includes it.
Security / Access Control Design
Check locallyOnly if the program includes it.
Interior Design Package
Check locallyOnly if the program includes it.
Permit Drawing Set
RequiredThe signed and sealed drawing sets the building department reviews.
Issued-for-Construction Drawing Set
LikelyThe final drawings the trades build from, with the permit comments included.
Coordination Drawings
LikelyTrade coordination drawings made after the contracts are awarded.
Environmental & Site Authorizations
Soil / Erosion Control Approval
Check locallyShovelCue has no Massachusetts record for this line yet, so check who handles it for this site.
EPA Construction General Permit Coverage
Check locallyUsual when the work disturbs a large part of the site.
- Agency
- U.S. EPA Region 1
- State rule
- Massachusetts uses the federal construction permit. File the notice of intent with EPA 14 days before disturbing an acre or more.
- Clock
- Set by law
- Source
- epa.gov
Stormwater Pollution Prevention Plan (SWPPP)
Check locallyUsual when the work disturbs a large part of the site.
- Agency
- Prepared by the site operator under the EPA permit
- State rule
- EPA does not approve the plan. Prepare it before you file the notice of intent and keep it at the site.
- Source
- epa.gov
Order of Conditions (Conservation Commission)
Check locallyFile a notice of intent with the conservation commission. It hears it within 21 days and issues its order 21 days after.
- Agency
- Town conservation commission under the state Wetlands Protection Act
- Clock
- Set by law
- Source
- malegislature.gov
401 Water Quality Certification
Check locallyLikely needed for a project like this. Check for wetlands, floodplain or other environmental conditions.
- Agency
- MassDEP
- State rule
- Only when fill or dredging in waters needs a federal permit. Small wetland losses under a final order of conditions are excluded.
- Source
- mass.gov
Flood Hazard / Floodplain Approval
Check locallyLikely needed for a project like this. Check for wetlands, floodplain or other environmental conditions.
Dewatering / Discharge Permit
Check locallyOnly if the site or work triggers it.
Soil Import / Export Approval
Check locallyOnly if the site or work triggers it.
Release Notification and Cleanup (Massachusetts Contingency Plan)
Check locallyLikely needed for a project like this. Check for wetlands, floodplain or other environmental conditions.
- Agency
- MassDEP Bureau of Waste Site Cleanup
- State rule
- A reportable release is reported to MassDEP. Within one year the site is cleaned up or tier classified.
- Source
- mass.gov
Brownfield / Remediation Approval
Check locallyLikely needed for a project like this. Check for wetlands, floodplain or other environmental conditions.
MassDEP Asbestos and Demolition Notifications
Check locallyLikely needed for a project like this. Check for wetlands, floodplain or other environmental conditions.
- Agency
- MassDEP
- State rule
- File the asbestos removal notice and the construction or demolition notice with MassDEP 10 working days before the work starts.
- Clock
- Set by law
- Source
- mass.gov
Air / Dust Permit
Check locallyOnly if the site or work triggers it.
Tree Removal Approval
Check locallyUsual when the work disturbs a large part of the site.
Sewer Connection or Extension Approval
Check locallyThe local sewer authority approves a sewer connection or extension. MassDEP now permits only certain industrial discharges.
- Agency
- Local sewer authority; MassDEP only for certain industrial discharges
- Source
- mass.gov
Permanent Solution (Site Closure)
Check locallyLikely needed for a project like this. Check for wetlands, floodplain or other environmental conditions.
- Agency
- MassDEP Bureau of Waste Site Cleanup
- State rule
- A cleanup ends with a Permanent Solution filed with MassDEP. Filed within 120 days of notification it carries no fee.
- Source
- mass.gov
Other Environmental Authorization
Check locallyOnly if the site or work triggers it.
Chapter 91 Waterways License
Check locallyOnly for work on or near tidelands, great ponds or regulated waterways. MassDEP will say in writing whether a license is required.
- Agency
- MassDEP Waterways Regulation Program
- Source
- mass.gov
Rare Species Review (MESA, Priority Habitat)
Check locallyOnly when the site is mapped as Priority or Estimated Habitat. Filing fees run from $300 to $4,000 by size of disturbance.
- Agency
- MassWildlife Natural Heritage and Endangered Species Program
- Source
- mass.gov
Utilities & Infrastructure
Water Service Approval
Check locallyLikely needed for a project like this, since new buildings need new utility service.
Water Main Extension Permit
Check locallyShovelCue has no Massachusetts record for this line yet, so check who handles it for this site.
Sewer Service Approval
Check locallyLikely needed for a project like this, since new buildings need new utility service.
Electric Service Approval
Check locallyAsk the electric utility early. It answers a capacity request within three weeks, then you file the work request for service.
- Agency
- Eversource, National Grid, Unitil or the municipal light plant
- Source
- mass.gov
Gas Service Approval
Check locallyThe gas company that serves the town confirms it can serve the site and designs the new service.
- Agency
- The gas company that serves the town
- Source
- mass.gov
Fire Flow / Water Capacity Confirmation
Check locallyLikely needed for a project like this, since new buildings need new utility service.
Utility Will-Serve Confirmation
Check locallyLikely needed for a project like this, since new buildings need new utility service.
Utility Authority Approval
Check locallyShovelCue has no Massachusetts record for this line yet, so check who handles it for this site.
Utility Load Approval
Check locallyShovelCue has no Massachusetts record for this line yet, so check who handles it for this site.
Utility Design Approval
Check locallyShovelCue has no Massachusetts record for this line yet, so check who handles it for this site.
Utility Relocation Approval
Check locallyOnly with work in or access from public infrastructure.
Utility Easement Approval
Check locallyOnly with work in or access from public infrastructure.
MassDOT State Highway Access Permit
Check locallyA MassDOT access permit for a driveway or work in the state highway layout. State rules set each review time.
- Agency
- MassDOT
- Clock
- Set by law
- Source
- mass.gov
County / Regional Road Approval
Check locallyOnly with work in or access from public infrastructure.
Road Opening Permit
Check locallyOnly with work in or access from public infrastructure.
Off-Site Improvement Approval
Check locallyOnly with work in or access from public infrastructure.
Telecom / Fiber Service Approval
LikelyPhone, internet and fiber service to the building.
Railroad / Transit Approval
Check locallyOnly with work in or access from public infrastructure.
Other Infrastructure Agency Approval
Check locallyOnly with work in or access from public infrastructure.
Permits & Construction Authorizations
Demolition Permit
Check locallyUsual when an existing structure is demolished.
Early Work Permit
Check locallyUsual when an existing structure is demolished.
Site Clearing Permit
Check locallyUsual when the work disturbs a large part of the site.
Excavation Permit
Check locallyUsual when the work disturbs a large part of the site.
Foundation Permit
Check locallyUsual when the work disturbs a large part of the site.
Building Permit
RequiredThe building official must issue or deny the permit in writing within 30 days of filing under the state building code.
- Agency
- Building commissioner or inspector of buildings
- Clock
- Set by law
- Source
- mass.gov
Plumbing Permit
RequiredOnly a licensed plumber can take out the permit, before work starts. The inspector acts on the application within two working days.
- Agency
- Local plumbing and gas inspector
- Source
- mass.gov
Electrical Permit
RequiredThe electrician gives the inspector of wires the permit notice before starting or within five days after starting.
- Agency
- Local inspector of wires
- Source
- malegislature.gov
Mechanical / HVAC Permit
RequiredThe heating and cooling permit, reviewed with the building permit.
Fire Protection Permit
RequiredThe sprinkler permit, reviewed by the fire code official.
Fire Alarm Permit
RequiredThe fire alarm permit, reviewed by the fire code official.
Elevator Permit
Check locallyStories not provided. Whether elevators are needed depends on the building height.
- Agency
- Massachusetts Office of Public Safety and Inspections
- State rule
- The state elevator program permits and inspects new elevators.
- Source
- mass.gov
Retaining Wall Permit
Check locallyOnly if the scope includes it.
Sign Permit
Check locallyOnly if the scope includes it.
Pool Permit
Check locallyOnly if the scope includes it.
Temporary Structure Permit
Check locallyOnly if the scope includes it.
Temporary Power Permit
LikelyLets the utility connect temporary power for construction.
Fire Department Plan Review
Check locallyOnly if the scope includes it.
- Agency
- Head of the local fire department
- State rule
- The building official sends the fire protection plans to the fire chief, who has 10 working days to review them.
- Clock
- Set by law
- Source
- mass.gov
Board of Health Approval (Title 5 Septic Permit)
Check locallyOnly if the scope includes it.
- Agency
- Local board of health
- State rule
- A site on a septic system needs a disposal system construction permit from the board of health before any system work.
- Source
- mass.gov
Other Specialty Permit
Check locallyOnly if the scope includes it.
Certificate of Occupancy and Use
RequiredEvery occupiable building needs it before use.
- Agency
- Building commissioner or inspector of buildings
- State rule
- The building commissioner issues the certificate within 10 days once the final inspection finds no violations.
- Clock
- Set by law
- Source
- mass.gov
Construction Readiness
Notice to Proceed / Authorization to Start
LikelyThe owner and lender release to start, with the permit in hand.
Preconstruction Meeting Complete
LikelyThe meeting where the owner, architect and builder agree how the job will run.
Site Logistics Plan Approved
LikelyStaging, haul routes and cranes, reviewed by the owner and the town.
Site Access Established
LikelyThe crews and deliveries can get onto the site.
Parking / Curb Use Approval
LikelyStreet closures or curb use, usually on urban sites.
Temporary Power Available
LikelyPower on site for construction. Utility scheduling drives the date.
Temporary Water Available
LikelyWater on site for construction from a hydrant meter or a temporary tap.
Construction Entrance Installed
LikelyA stabilized entrance so trucks do not track soil onto the road.
Erosion / Sediment Controls Installed
LikelySilt fence and controls in place before digging, as the erosion control plan shows.
Dig Safe Notice (811)
LikelyMark the dig area in white and notify Dig Safe at least 72 business hours before digging. A ticket lasts 30 days.
- Agency
- Dig Safe System (811)
- Clock
- Set by law
- Source
- mass.gov
Site Safety Plan Approved
LikelyThe safety plan for this site, in place before crews start.
Emergency Action Plan Complete
LikelyWhat crews do in an emergency on this site.
Adjacent Property Documentation Complete
LikelyPhotos and a condition survey of neighboring buildings before work starts.
Adjoining Property Access Agreement
LikelyAgreements to work from or protect a neighbor property. Tight lots make these slow.
Construction Fencing / Security Ready
LikelyFencing and security around the site before work starts.
Third-Party Testing Agency Engaged
LikelyThe special inspections agency named on the permit.
Survey Control Established
LikelyThe surveyor sets control points so the building goes in the right place.
Required Site Signage / Postings Complete
LikelyThe permit placard and the labor postings on site.
Temporary Facilities Ready
LikelyTrailers, toilets and other temporary facilities on site.
Crane / Hoist Logistics Approved
LikelyStreet use and pick plans for cranes, plus an FAA filing if the height calls for it.
Major Utility Relocations Complete
LikelyUtility lines in the way are moved before the main work starts.
Site Ready to Mobilize
LikelyThe milestone for your target construction start.
Sources
- mass.govSite Plan Review
- resources.capecodcommission.orgCape Cod Commission Regional Impact Review
- malegislature.govDefinitive Subdivision Plan Approval
- malegislature.govVariance (Zoning Board of Appeals)
- malegislature.govSpecial Permit
- malegislature.govPublic Hearing
- mass.govZoning Appeal Period (20 Days)
- malegislature.govLocal Historic District Certificate
- mass.govComprehensive Permit (Chapter 40B)
- mass.govMEPA Environmental Review
- sec.state.ma.usMassachusetts Historical Commission Review
- malegislature.govApproval Not Required Plan Endorsement
- malegislature.govMBTA Communities Multifamily Zoning Check
- mass.govEnergy Code Package (Base, Stretch or Specialized Code)
- epa.govEPA Construction General Permit Coverage
- malegislature.govOrder of Conditions (Conservation Commission)
- mass.gov401 Water Quality Certification
- mass.govRelease Notification and Cleanup (Massachusetts Contingency Plan)
- mass.govMassDEP Asbestos and Demolition Notifications
- mass.govSewer Connection or Extension Approval
- mass.govChapter 91 Waterways License
- mass.govRare Species Review (MESA, Priority Habitat)
- mass.govElectric Service Approval
- mass.govGas Service Approval
- mass.govMassDOT State Highway Access Permit
- mass.govBuilding Permit
- mass.govPlumbing Permit
- malegislature.govElectrical Permit
- mass.govElevator Permit
- mass.govBoard of Health Approval (Title 5 Septic Permit)
- mass.govDig Safe Notice (811)
Items with no source link come from the national list and are decided by the town or the site. Ask the local office.
Other project types in Massachusetts
This is general information from public sources. It is not legal advice. Confirm every item with your town and the agencies named before you rely on it.