Approvals for a retail tenant fit out in Massachusetts
This is the list ShovelCue builds for a retail tenant fit out in Massachusetts before it knows anything else about the site. It has 13 items in 4 groups.
Required the rules say soLikely usual for this kind of projectCheck locally depends on the site or the town
Design & Permit Documents
Energy Code Package (Base, Stretch or Specialized Code)
Check locallyNew lighting and equipment may need an energy code report with the permit.
- Agency
- Local building official
- State rule
- Check which energy code the town adopted. Stretch and Specialized Code towns need a HERS rating or Passive House for new homes.
- Source
- mass.gov
Permit Drawing Set
RequiredCommercial work needs drawings signed and sealed by a design professional for the permit review.
Permits & Construction Authorizations
Building Permit
RequiredA tenant fit-out needs a building permit for the new layout and systems.
- Agency
- Building commissioner or inspector of buildings
- State rule
- The building official must issue or deny the permit in writing within 30 days of filing under the state building code.
- Clock
- Set by law
- Source
- mass.gov
Plumbing Permit
LikelyNeeded when restrooms, sinks or piping change.
- Agency
- Local plumbing and gas inspector
- State rule
- Only a licensed plumber can take out the permit, before work starts. The inspector acts on the application within two working days.
- Source
- mass.gov
Electrical Permit
RequiredA fit-out almost always adds or moves circuits and lighting.
- Agency
- Local inspector of wires
- State rule
- The electrician gives the inspector of wires the permit notice before starting or within five days after starting.
- Source
- malegislature.gov
Mechanical / HVAC Permit
LikelyA fit-out usually changes ducts, diffusers or units.
Fire Protection Permit
LikelySprinkler heads usually move with new walls and ceilings.
Fire Alarm Permit
Check locallyOnly when the fire alarm devices change.
Sign Permit
Check locallyOnly when the tenant puts up new signs.
Certificate of Occupancy and Use
LikelyA new tenant usually needs a certificate of occupancy before it opens.
- Agency
- Building commissioner or inspector of buildings
- State rule
- The building commissioner issues the certificate within 10 days once the final inspection finds no violations.
- Clock
- Set by law
- Source
- mass.gov
Land Use & Entitlements
Landlord or Condo Board Approval
LikelyThe landlord usually approves the plans before they go to the town.
Zoning Permit
Check locallyMany towns check that the new tenant use is allowed with a zoning permit or certificate of use. In Massachusetts the building inspector enforces zoning and must withhold a building permit that would violate it.
- Agency
- Building commissioner or inspector of buildings
- Source
- malegislature.gov
Environmental & Site Authorizations
Asbestos Inspection and Notification
LikelyA commercial space is checked for asbestos before renovation. In Massachusetts the asbestos removal notice goes to MassDEP 10 working days before the removal starts.
- Agency
- MassDEP
- Source
- mass.gov
Sources
- mass.govEnergy Code Package (Base, Stretch or Specialized Code)
- mass.govBuilding Permit
- mass.govPlumbing Permit
- malegislature.govElectrical Permit
- malegislature.govZoning Permit
- mass.govAsbestos Inspection and Notification
Items with no source link come from the national list and are decided by the town or the site. Ask the local office.
Other project types in Massachusetts
This is general information from public sources. It is not legal advice. Confirm every item with your town and the agencies named before you rely on it.